Design for Brook Park Improvements

Shortly after I was sworn into office, I began looking at the city’s plan for our parks – particularly in Northwoods, which had not seen any significant investment in its parks for several years. I was happy to see that there was a $30,000 budget item for Autumn Park – meant to build a walking path and for stream improvements there.

While I was glad that there was some money allocated to the neighborhood’s parks, I did not think this was the best use of that money. I believe the stream improvements in Autumn Park are necessary – particularly removal of invasive species. That said, this amount of money would not have fixed the problems there. The issue is that state environmental regulations prevent us from removing ivy on the banks of streams without doing something else to prevent erosion. This does need to be fixed, but it needs a better funding source before we try to tackle it piecemeal. I wrote about this issue about a year ago – also indicating that I thought the money would probably be spent better in Brook Park.

In April, Councilman Naser and I went to NANA’s Spring meeting, and asked residents for feedback on what they’d like to see in our parks. The consensus was to focus primarily on Brook Park, and to make improvements in its accessibility. In particular:

  • The general consensus was that we should focus on building an ADA accessible path to the pavilion, clear out some of the trees (especially the ones that produce pine straw) around the pavilion (replacing them with hardwoods elsewhere) , add tables, and generally spruce up the pavilion. If we could extend the path to the playground, that would also be nice for people with strollers.
  • People were vocal that they did not want a path around Autumn Park, or trees planted on its perimeter.

You can watch a full video of the meeting here.

Once we had this meeting, I met with city staff to determine what we could do for $30,000. I then had to lobby the other council members to fund this project (even though $30,000 had been budgeted toward Northwoods parks initially, that money has to be reallocated each year in the budgeting process).

While I know that residents have not seen much movement from the outside, any time the council has discussed budgeting or funding projects, I have made sure this one is not forgotten, and is close to the top of the list. It’s important to me that we do this after going through the process of getting neighborhood consensus, and not something I’m willing to let drop.

I am happy to say that my persistence, combined with the hard work of city staff, has paid off! We now have a preliminary design, which you can see here:

Proposed Brook Park Improvements

I think this plan would accomplish everything that residents said they wanted to see done with this money – and is actually even more comprehensive than I initially thought we’d be able to do for $30,000. Here are some notes to consider when reviewing it:

  • The ADA trail will start by the dog-poop station and loop around by the pavilion and then end at the playground. It will be a hard surface suitable for wheel chairs. Some trees will have to be removed to make room for it.
  • They are proposing to add 5 additional grills, along with 9 picnic tables that will be placed along the path as well as by the playground.
  • They are proposing putting in a retaining wall along the path, as well as some stairs leading directly to the playground area
  • They are proposing a soft-surface (unpaved) path on the far side of the park that would also connect to the playground area and pavilion.

I do think the plan above provides most of what Northwoods residents asked for. That said, there is still time to give feedback about any other changes that you’d like to see. If there’s something missing, or you have a suggestion for some other change, please email me at joseph.geierman@doravillega.us and I will ask our Public Works Director to look into it.